Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
主站蜘蛛池模板: 精品高朝久久久久9999| 欧美性黑人极品hd| av无码中出一区二区三区| 十八禁av无码免费网站| 亚洲国产欧美国产综合久久 | 国产精品久久久久久久久岛| 男女做爰猛烈啪啪吃奶图片 | 国产精品天干天干| 18禁成人???猛撞视频在线看| 少妇饥渴偷公乱av在线观看涩爱| 精品乱码一区内射人妻无码| 亚洲熟女片嫩草影院| 漂亮人妻被中出中文字幕久久| 无遮挡又爽又刺激的视频| 婷婷丁香社区| 久久av无码精品人妻出轨| 99热精这里只有精品| 男人边吃奶边做好爽免费视频| 国产草莓精品国产av片国产| 久久精品亚洲精品国产色婷| 亚洲日韩色欲色欲com| 国产成人无码aⅴ片在线观看| 无码乱肉视频免费大全合集| 2020亚洲欧美国产日韩| 在线看免费无码av天堂| 国产精品无码专区在线观看| 日本 欧美 制服 中文 国产 | 久久香蕉国产线看观看亚洲小说| 欧美在线a| 小说区 综合区 首页| 97成人精品区在线播放| 精品人妻码一区二区三区| 无码爆乳护士让我爽| 成在线人免费| 精品无码久久久久久久久| 亚洲成av人不卡无码影片| 久久超乳爆乳中文字幕| 夜夜揉揉日日人人| 亚洲欧美国产毛片在线| av无码人妻中文字幕| 国产又滑又嫩又白|