国产精品无码aⅴ嫩草,久久精品国产只有精品66,日本在线一区二区三区欧美,一区二区亚洲精品国产片

AC source power & DC source power manufacturing factory

Test Application on AC Contactor

AC contactor is a switching device which uses electromagnetic force and spring elastic force to connect and break contacts to control the on-off of load circuit. It is suitable for frequent operation and long-distance control. It is an important component of automatic control circuit system. With the growth of national economic demand and power industry, the demand for AC contactors continues to grow, and competition is increasingly fierce. In order to ensure product quality, the testing of AC contactors is particularly important.

Following will take AC contactor test requirements as an example to introduce AC contactor test scheme in detail.
Before starting the test, we first understand its working principle: when the AC contactor's attraction coil is electrified, the static iron core produces electromagnetic attraction, the armature is absorbed, and the connecting rod connected with the armature drives the contact action, so that the normally closed contacts are disconnected, and the often open contacts are closed, both of them are linked, and the contactor is in the electrified state; When the coil is cut off, the electromagnetic suction disappears, the armature is released under the action of spring, which makes the normally closed contacts closed, the often open contacts disconnected, and the contactor is in a state of power loss.

The client test requirements are as follows: 

1. ON/OFF test: Set ON/OFF AC voltage (rated voltage), starting angle 90 degrees, termination angle 0 degrees, ON/OFF twice, and finally OFF.            
2. Characteristic test: setting voltage (rated voltage), starting angle 30 and termination angle 90 and output ON. Read peak current immediately, delay 500 ms, read and maintain current, maintain power consumption, and finally OFF.           
3. Suction voltage test: first set the suction start voltage (20% of rated voltage), output to ON, then every 200 ms, the voltage rises in accordance with 5V step up to suction, read the suction voltage, and finally output OFF.            
4. Release Voltage Test: First set the release starting voltage (rated voltage), output to ON, set the release voltage (rated voltage 68%) and then every 200 ms, the voltage descends according to 5V step to read the release voltage after release; finally output the OFF.

Among them:
Test requirements 1,2, can be achieved by the panel setting function of ADMIRE POWER standard AC power supply APA1000 series . This function can be set voltage, frequency, starting phase angle and terminating phase angle. The range of setting phase angle is 0-360.

Test requirements 3,4, can be achieved through the ADMIRE POWER standard AC power APA1000 series power supply internal test group, the function can be set up 35 test points to set the starting voltage value, termination voltage value, step voltage value, start frequency, termination frequency and single step time, so that the power supply voltage and time Frequency varies in a step-by-step fashion. If the 35 test points are not enough, the intelligent AC power supply APA2000 series (touch screen display) can provide five test groups, each of which has 35 test points, and each test point can set different voltage, frequency and time.

Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
主站蜘蛛池模板: 亚洲欧美综合人成在线| 特黄三级又爽又粗又大| 国产亚洲精品一区二三区| 粗大的内捧猛烈进出看视频| 少妇熟女天堂网av| 亚洲熟妇久久精品| 污污污www精品国产网站| 99久久国产综合精品女图图等你 | 国产精品欧美一区二区三区| 影音先锋男人站| av无码国产在线看免费网站| 亚洲永久无码3d动漫一区| 一本大道伊人av久久综合| 国产精品热久久高潮av袁孑怡| 国产精品345在线播放| 亚洲精品中文字幕一区二区三区 | 久久综合少妇11p| 午夜无码精品国产片| 国产精品久久久久久52avav| 日本高清视频www夜色资源 | 亚洲精品乱码久久久久红杏| 久久久国产精品黄毛片| 久久久亚洲一区二区三区| 成人av无码国产在线观看| 人人澡人人曰人人摸看| 女厕厕露p撒尿八个少妇 | 国产精品久久久久无码人妻| 久久久国产精品无码一区二区| 亚洲欧洲日产韩国无码| 男女无遮挡猛进猛出免费视频国产| 九九99热久久精品离线6| 免费看一区二区三区四区| 乱子伦av无码中文字| 嫩草欧美曰韩国产大片| 久久精品成人无码观看不卡| 思热99re视热频这里只精品| 国产精品热久久高潮av袁孑怡| 无码人妻丰满熟妇啪啪网不卡| 国产在线精品视频二区| 8888四色奇米在线观看| 中文字幕免费无码专区剧情|